What's more, part of that Pass4cram CDCP dumps now are free: https://drive.google.com/open?id=1al4CNda22263J9lWcfmDeYbx6c2aTl2J
If you are determined to get the certification, our CDCP question torrent is willing to give you a hand; because the study materials from our company will be the best study tool for you to get the certification. Now I am going to introduce our CDCP Exam Question to you in detail, please read our introduction carefully, we can make sure that you will benefit a lot from it. If you are interest in it, you can buy it right now.
Pass4cram is a reliable platform to provide candidates with effective study braindumps that have been praised by all users. For find a better job, so many candidate study hard to prepare the Certified Data Centre Professional (CDCP), it is not an easy thing for most people to pass the CDCP Exam, therefore, our website can provide you with efficient and convenience learning platform, so that you can obtain as many certificates as possible in the shortest time.
>> CDCP Valid Exam Tutorial <<
Don't worry because "Pass4cram" is here to save you from these losses with its updated and real EXIN CDCP exam questions. We provide you with the latest prep material which is according to the content of EXIN CDCP Certification Exam and enhances your knowledge to crack the test. Pass4cram practice material is made by keeping in focus all the sections of the current syllabus.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
Topic 6 |
|
Topic 7 |
|
NEW QUESTION # 12
How many monitoring points should be used in Temperature Measurement?
Answer: B
Explanation:
According to the EPI Data Centre Professional (CDCP) Reference Materials, the recommended number of monitoring points for temperature measurement in a data centre is 3 per rack: one at the top, one at the middle, and one at the bottom1. This is to ensure that the temperature distribution within the rack is uniform and within the acceptable range for the equipment. The temperature sensors should be placed at the front of the rack, where the air enters the equipment, and not at the back, where the hot air exits1.
References: 1: EPI Data Centre Professional (CDCP) Reference Materials, page 23.
NEW QUESTION # 13
systems are designed specifically to protect the structure of a building.
Answer: D
Explanation:
Water sprinkler systems are designed to protect the structure of a building from fire by suppressing or extinguishing the flames with water. Water sprinkler systems are typically installed in the ceiling or walls of a building and are activated by heat or smoke detectors. Water sprinkler systems can reduce the risk of fire spreading and causing structural damage to the building.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 28
*Fire Protection Systems for Data Centers | EPI
NEW QUESTION # 14
The temperature and humidity values indicated on the display of the Computer room air conditioner unit are the values measured at which point?
Answer: A
Explanation:
According to the IBM document on temperature and humidity design criteria1, the temperature and humidity values indicated on the display of the computer room air conditioner unit are the values measured at the intake of the air conditioner. This is because the intake is where the air conditioner draws the air from the computer room and cools and dehumidifies it before sending it back to the computer room. The display shows the current conditions of the computer room air, which are used to adjust the cooling and dehumidifying operations of the air conditioner. The values measured at the exhaust (outlet) of the air conditioner are not displayed, as they are not relevant for the computer room environment. The values measured at the front of the rack of the aisle the air conditioner is situated are also not displayed, as they may vary depending on the distance and location of the rack. The average value between the intake and exhaust (outlet) of the air conditioner is not displayed, as it does not reflect the actual conditions of the computer room air or the air conditioner performance.
References: 1: Temperature and humidity design criteria - IBM
NEW QUESTION # 15
The expected time to Recover/Repair from a system from a failure is defined as.
Answer: A
Explanation:
The expected time to recover or repair from a system from a failure is defined as MTTR (mean time to recovery or mean time to repair). MTTR is the average time it takes to restore a system or product to its normal operation after a failure. MTTR includes the time spent on detecting, diagnosing, and fixing the problem. MTTR is an important metric for measuring the reliability and availability of a system or product, as well as the efficiency and effectiveness of the incident management process. A lower MTTR indicates a faster and more reliable recovery or repair process.
References:
*EPI Data Centre Professional (CDCP®) Preparation Guide, page 17
*What is MTTR? | IBM
*Explained: All Meanings of MTTR and Other Incident Metrics
NEW QUESTION # 16
What are the four main components of a refrigeration circuit?
Answer: B
Explanation:
The four main components of a refrigeration circuit are the evaporator, the compressor, the condenser, and the expansion valve, according to the CDCP Preparation Guide1 and various web sources234. A refrigeration circuit is a system that transfers heat from a low-temperature region to a high-temperature region, using a working fluid called refrigerant. The refrigeration circuit operates in a closed loop, where the refrigerant changes its state from liquid to vapor and back to liquid, while absorbing and releasing heat. The four main components of the refrigeration circuit perform the following functions:
*The evaporator is a heat exchanger that absorbs heat from the low-temperature region, such as the data centre room, and transfers it to the refrigerant. The refrigerant enters the evaporator as a low-pressure, low-temperature liquid, and leaves the evaporator as a low-pressure, low-temperature vapor.
*The compressor is a mechanical device that increases the pressure and temperature of the refrigerant vapor.
The refrigerant enters the compressor as a low-pressure, low-temperature vapor, and leaves the compressor as a high-pressure, high-temperature vapor.
*The condenser is another heat exchanger that releases heat from the refrigerant to the high-temperature region, such as the outside air or water. The refrigerant enters the condenser as a high-pressure, high-temperature vapor, and leaves the condenser as a high-pressure, low-temperature liquid.
*The expansion valve is a device that reduces the pressure and temperature of the refrigerant liquid. The refrigerant enters the expansion valve as a high-pressure, low-temperature liquid, and leaves the expansion valve as a low-pressure, low-temperature liquid. The expansion valve also controls the flow of the refrigerant into the evaporator, depending on the cooling load.
References:
1: CDCP Preparation Guide, page 19, section 2.3.3 2: The Refrigeration Cycle5, page 1, section 1 3:
Fundamentals of Cooling in Data Center6, page 1, section 1 4: The Refrigeration System, Its Four Main Components, And Their Functions7, page 1, section 1
NEW QUESTION # 17
......
It is acknowledged that there are numerous CDCP learning questions for candidates for the CDCP exam, however, it is impossible for you to summarize all of the key points in so many materials by yourself. But since you have clicked into this website for CDCP practice materials you need not to worry about that at all because our company is especially here for you to solve this problem. We have a lot of regular customers for a long-term cooperation now since they have understood how useful and effective our CDCP Actual Exam is.
CDCP Review Guide: https://www.pass4cram.com/CDCP_free-download.html
2025 Latest Pass4cram CDCP PDF Dumps and CDCP Exam Engine Free Share: https://drive.google.com/open?id=1al4CNda22263J9lWcfmDeYbx6c2aTl2J